Kent Lyon Architect
HomeProjectsThinking of building?AboutContactEnquire
The Rainbow House, a coloured translucent shelter across the playground at Rapids Landing Primary School, Margaret River, under a clear sky

Schools, homes and heritage buildings for the South West, designed in Bunbury since 1996.

Rapids Landing Primary School covered shelter, Margaret River, 2021. The students call it the Rainbow House.

We are three registered architects at 96 Beach Road, Bunbury: Kent Lyon (FRAIA, M.ICOMOS), Rebecca Martin and Nic Rep. Our work runs from master planning a school to restoring an 1896 building.

Thinking of building? Start with three questions.

What do I want to build?

Site visit, consultation and preliminary design. We meet you on site to discuss your vision and assess the site, then draw a high-level zoning plan for the most efficient use of space.

What am I allowed to build?

Site and planning analysis. Zoning, setbacks, height restrictions, heritage considerations and site constraints, checked to find what is possible.

What can I afford to build?

Cost overview. A broad estimate of construction costs based on industry benchmarks, before design starts.

That is our Feasibility Study: obligation free, at a fixed fee set by project type and location, and deducted from the design fee if you go ahead.

Four sites we went back to.

The same school, campus or building, more than once on our project list. Built with Challis Builders and Devlyn Construction, with courtyards by Emerge Associates.

The Bunbury SHS Cafeteria on its steel columns above the slope, with the old school buildings and the Bunbury foreshore behind

Bunbury Senior High School

  1. 2014Year 7 Centre
  2. 2021Cafeteria
  3. 2022Physical Education Building

On a steep campus above the foreshore: a Year 7 Centre floating over the slope, a cafeteria on steel columns up to 9 m long, a two-storey PE building, and a STEM lab and robotics room fit-out.

Photographs of Bunbury Senior High School
Covered walkways with translucent roof sheeting in the Bunbury TAFE courtyard

South Regional TAFE, Bunbury campus

  1. 2019Collaborative space
  2. 2020NDIS classrooms
  3. 2021Courtyard and walkways

Three projects on the Bunbury campus, from a collaborative space with wavy acoustic ceilings to the central courtyard and its covered walkways.

Photographs of South Regional TAFE
Blue glazed tile wall and coloured glazing at Rapids Landing Primary School

Rapids Landing Primary School, Margaret River

  1. 2018The school
  2. 2021Covered shelter, the Rainbow House

The school first, then the Rainbow House, a coloured translucent sun shelter for assemblies. Another covered walkway there, in coloured panels, shelters the early learning students from the southerly weather.

Photographs of Rapids Landing Primary School
First floor of the Old Lyric with exposed roof trusses, arched windows and brick

Lyric Theatre and the Old Lyric, Bunbury

  1. 2016Conservation Management Plan and works
  2. 2024First-floor fit-out for Market Eating House

The conservation plan and facade works first; years later, the interior of the first floor.

Photographs of Lyric Theatre and the Old Lyric

“We love using colour in our projects.”

From our Instagram. On our buildings colour usually has a job, so here is a colour board for three of them: five colours sampled from each building’s photograph, from a schoolyard to a house in the bush.

Aerial view of the coloured gabled classrooms and play areas at Tuart Forest Primary School, Dalyellup

Colour to engage young minds

Tuart Forest Primary School, Dalyellup, 2012A cluster of gabled classrooms where colour and form make a distinctly vibrant place.

Ochre and white wall panels in a treatment area of the Child Health Centre, Bunbury

Colour to find the way

Child Health Centre, Bunbury, 2025A dark space turned bright and welcoming for children receiving treatment; colour marks out each area.

Gelorup Residence on its bush block, built of rammed earth, Donnybrook stone, steel and cedar

Colour from the hill

Gelorup Residence, 2016Rammed earth, locally sourced Donnybrook stone, steel and cedar weatherboards, chosen to grow out of an elevated bush block.

The restored brick and render facade of the Lyric Theatre, Bunbury, with its round and arched windows
Lyric Theatre, Bunbury: Conservation Management Plan and works, 2016.

Bunbury’s older buildings.

A Conservation Management Plan sets out what matters about a heritage place and how to look after it. We prepared the plan to reinstate the Lyric Theatre in 2016, then documented the works for construction: structural repairs, new bathrooms and tuck-pointing of the brick facade.

  • Lotteries House, 2018An 1896 building. Brick tuck-pointing, structural repairs and extensive internal refurbishment, back to its original condition.
  • Bunbury Museum, 2013Concept design for the redevelopment of the Museum and Heritage Centre.
  • The Old Lyric, 2024A restaurant fit-out on the first floor, with a new ramp and stairs between levels.

Kent Lyon is a member of ICOMOS, the International Council on Monuments and Sites.

Tell us about your project.

Kent Lyon, Rebecca Martin and Nic Rep, registered architects (WA Nos. 1571, 3578 and 3520). About the practice

This is a concept website: the form does not send anything.

Nothing was sent. This is a concept website, not Kent Lyon Architect’s official site. Please call (08) 9791 5404 or email info@kentlyon.com.au.
CallEnquire